J. Thomas Electric | We do it Right the first time!

J.Thomas Electric

We do it RIGHT the first time!

Residential - Click here to browse some of our home installations
Commercial -
Have outdated electric in your building? Click here

Portfolio

Elk Lake School District

  • As part of an energy savings project, the company Installed fluorescent lighting to replace original incandescent and fluorescent fixtures.
  • The company specified, ordered and installed new circuit breaker panel interiors used within the districts buildings.
  • Completed electrical construction of two new computer rooms including the networking for the computers.
  • Completed the removal of old emergency power generators, relocated and installed a new 35 KW and 75 KW generator.
  • Completed replacement of existing mercury vapor lighting in the high school gymnasium with new metal halide lighting.
  • Completed electrical construction for several new classrooms added to the vo-tech.
  • Completed the installation of new 2000-amp service in the Primary Center and a 3000-amp service in the High School. This included the removal of the original high school service and transformer, which were 36 years old.
  • Completed the rewiring of a typing classroom to convert it for computer use classroom, including the network cabling, and linking of all of the computer rooms on one network.

Ronco Northeast Eng.

  • Project management and electrical engineering for a large building addition and machinery installation in that facility.
  • Coordination and installation of a 800 amp electrical service for new process equipment in Mountaintop, Pa.
  • Machinery design and upgrades.

A. Pickett Construction

  • Installation of the electrical service and wiring systems in newly constructed Rite Aid Pharmacy in Clarks Summit, Pa.

Work completed for other electrical contractors

  • Project supervision and installation of a new 200-amp, 480-volt, 3-phase panel, a new 480 to 120 volt transformer and a new 200-amp, 120-volt, 3-phase panel for a factory in Scranton, Pa.
    Installation of new fluorescent lighting and outlets in a factory in Scranton, Pa.
  • Installation of new machinery in a factory in Scranton, Pa.
  • Installation of electrical services and systems in custom built homes.
  • Installation of electrical services and wiring systems in newly constructed townhouses in Clarks Summit, Pa.
  • Construction of a new refrigerated warehouse Gouldsboro, Pa.
  • Construction of new stores at the Shoppes at Montage in Scranton, Pa.
  • Installation of wiring for new machinery in a factory in Hazelton, Pa.
  • Construction of a food manufacturing plant in Hazelton, Pa.

Process Control

Proconex

  • Installation and start-up of a new process control system as part of a project to increase productivity at the Celotex plant in Falls, Pa.
  • Process controls migration project for Gilberton Power plant in Gilberton, Pa. This project required the rewiring of 1500 control points , the removal of old control equipment and installation of new equipment. The project was completed in 7 days during a plant shutdown for maintenance.
  • Process control instrumentation service and repair.
  • Valve and actuator repair and calibration.

Ives Envision

  • Project supervision and installation of a new process control system at a gas production facility for Conectiv energy. The installation was part of a project to increase productivity at this facility.
Copyright ©2009 J. Thomas Electric | 41 Wilmar Dr | Tunkhannock, PA 18657-6627 | (570) 639-3047
Pennsylvania Contractors Number - PAOAGHIC 000769. Member of The Better Business Bureau
We are an American Home Shield and Home Service USA repair company.
Site Design by EMCS Web Marketing