Portfolio
Elk Lake School District
- As part of an energy savings project, the company Installed fluorescent lighting to replace original incandescent and fluorescent fixtures.
- The company specified, ordered and installed new circuit breaker panel interiors used within the districts buildings.
- Completed electrical construction of two new computer rooms including the networking for the computers.
- Completed the removal of old emergency power generators, relocated and installed a new 35 KW and 75 KW generator.
- Completed replacement of existing mercury vapor lighting in the high school gymnasium with new metal halide lighting.
- Completed electrical construction for several new classrooms added to the vo-tech.
- Completed the installation of new 2000-amp service in the Primary Center and a 3000-amp service in the High School. This included the removal of the original high school service and transformer, which were 36 years old.
- Completed the rewiring of a typing classroom to convert it for computer use classroom, including the network cabling, and linking of all of the computer rooms on one network.
Ronco Northeast Eng.
- Project management and electrical engineering for a large building addition and machinery installation in that facility.
- Coordination and installation of a 800 amp electrical service for new process equipment in Mountaintop, Pa.
- Machinery design and upgrades.
A. Pickett Construction
- Installation of the electrical service and wiring systems in newly constructed Rite Aid Pharmacy in Clarks Summit, Pa.
Work completed for other electrical contractors
- Project supervision and installation of a new 200-amp, 480-volt, 3-phase panel, a new 480 to 120 volt transformer and a new 200-amp, 120-volt, 3-phase panel for a factory in Scranton, Pa.
Installation of new fluorescent lighting and outlets in a factory in Scranton, Pa. - Installation of new machinery in a factory in Scranton, Pa.
- Installation of electrical services and systems in custom built homes.
- Installation of electrical services and wiring systems in newly constructed townhouses in Clarks Summit, Pa.
- Construction of a new refrigerated warehouse Gouldsboro, Pa.
- Construction of new stores at the Shoppes at Montage in Scranton, Pa.
- Installation of wiring for new machinery in a factory in Hazelton, Pa.
- Construction of a food manufacturing plant in Hazelton, Pa.
Process Control
Proconex
- Installation and start-up of a new process control system as part of a project to increase productivity at the Celotex plant in Falls, Pa.
- Process controls migration project for Gilberton Power plant in Gilberton, Pa. This project required the rewiring of 1500 control points , the removal of old control equipment and installation of new equipment. The project was completed in 7 days during a plant shutdown for maintenance.
- Process control instrumentation service and repair.
- Valve and actuator repair and calibration.
Ives Envision
- Project supervision and installation of a new process control system at a gas production facility for Conectiv energy. The installation was part of a project to increase productivity at this facility.